The National Times - NASA scraps Tuesday Moon launch due to storm

NASA scraps Tuesday Moon launch due to storm


NASA scraps Tuesday Moon launch due to storm
NASA scraps Tuesday Moon launch due to storm / Photo: © AFP/File

NASA has called off the scheduled Tuesday launch of its historic uncrewed mission to the Moon due to a tropical storm that is forecast to strengthen as it approaches Florida.

Change text size:

After two previously canceled launch attempts, NASA is weighing returning the Artemis 1 mission rocket to its assembly site under the threat of extreme weather.

"NASA is forgoing a launch opportunity... and preparing for rollback (from the launchpad), while continuing to watch the weather forecast associated with Tropical Storm Ian," it said on Saturday.

The US National Hurricane Center (NHC) said Ian is due to "rapidly intensify" over the weekend as it moves toward Florida, home to the Kennedy Space Center, from which the rocket is set to launch.

Currently south of Jamaica, the storm is expected to approach Florida's west coast "at or near major hurricane strength" early next week, threatening storm surge, flooding and hurricane-force winds across much of the state, the NHC said.

On the launchpad, the giant orange and white Space Launch System (SLS) rocket can withstand wind gusts of up to 137 kilometers (85 miles) per hour. But if it has to be sheltered, the current launch window, which runs until October 4, will be missed.

A decision on whether to roll back the rocket to the Vehicle Assembly Building is due to be taken by the Artemis 1 team on Sunday, "to allow for additional data gathering and analysis," with the operation, if necessary, starting late Sunday or Monday morning, NASA said.

Jim Free, associate administrator for the agency's exploration systems development directorate, said on Twitter that a "step-wise approach" to the decision to roll back preserves "a launch opportunity if conditions improve," indicating a launch date before October 5 was still on the table.

If not, the next launch window will run from October 17 to 31, with one possibility of take-off per day, except from October 24-26 and 28.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop it, in preparation for future Moon-bound journeys with humans aboard.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

A successful Artemis 1 mission would come as a huge relief to the US space agency, after years of delays and cost overruns.

But another setback would be a blow to NASA, after two previous launch attempts were scrapped when the rocket experienced technical glitches including a fuel leak.

The cost of the Artemis program is estimated to reach $93 billion by 2025, with its first four missions clocking in at a whopping $4.1 billion each, according to a government audit.

S.Ross--TNT

Featured

Yesim Travel eSIMs Offer Alternative to Traditional Roaming Charges

Swiss telecommunications provider Yesim is positioning its travel eSIM services as a cost-effective alternative to conventional mobile roaming. With over four million users globally, the company offers digital plans designed to eliminate daily data caps and unpredictable charges for travelers in more than 200 destinations.

Samsung Galaxy S27 Series Camera Design Leaked via Lens Protectors

Images of camera lens protectors for the upcoming Samsung Galaxy S27 series have surfaced, offering new details about the flagship phones' rear design. The leak suggests that while the standard Galaxy S27 and S27+ will keep a vertical triple-camera layout, the Pro and Ultra models may adopt a distinct configuration with separate openings for the main and ultrawide sensors.

Driving Global Innovation - GTDC Summit APJ Underscores Distribution's Transformative Power

AI, scalability and channel empowerment lead the conversations at this year's executive event

Archive of Our Own Restores Service After Weeks-Long Security Shutdown

The Archive of Our Own (AO3) has resumed operations after a 17-day shutdown caused by an unspecified security breach. The Organization for Transformative Works announced the restoration on November 15, noting that while user data likely remains secure, certain site functionalities are temporarily limited to manage high traffic and expedite the return to full service.

Change text size: