The National Times - NASA's Tuesday Moon launch threatened by storm

NASA's Tuesday Moon launch threatened by storm


NASA's Tuesday Moon launch threatened by storm
NASA's Tuesday Moon launch threatened by storm / Photo: © AFP/File

NASA's historic uncrewed mission to the Moon is facing fresh difficulties.

Change text size:

After technical problems derailed two launch attempts several weeks ago, a new liftoff of the Artemis 1 mission scheduled for Tuesday is now threatened by a storm gathering in the Caribbean.

The storm, which has not yet been assigned a name, is currently located south of the Dominican Republic.

But it is expected to grow into a hurricane in the coming days and could move north to Florida, home to the Kennedy Space Center, from which the rocket is set to launch.

"Our plan A is to stay to course and to get the launch off on September 27," Mike Bolger, NASA's exploration ground systems manager, told reporters on Friday. "But we realized we also need to be really paying attention and thinking about a plan B."

That would entail wheeling the giant Space Launch System rocket back to the Vehicle Assembly Building, known as VAB.

"If we were to go down to Plan B we need a couple days to pivot from our current tanking test or launch configuration to execute rollback and get back into the protection of the VAB," Bolger said, adding that a decision should be made by early afternoon on Saturday.

On the launch pad the orange and white SLS rocket can withstand wind gusts of up to 137 kilometers per hour. But if it has to be sheltered, the current launch window, which runs until October 4, will be missed.

The next launch window will run from October 17 to 31, with one possibility of take-off per day, except from October 24-26 and 28.

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns. But another setback would be a blow to NASA, after two previous launch attempts were scrapped when the rocket experienced technical glitches including a fuel leak.

The launch dates depend on NASA receiving a special waiver to avoid having to retest batteries on an emergency flight system that is used to destroy the rocket if it strays from its designated range to a populated area.

On Tuesday the launch window will open at 11:37 local time and will last 70 minutes.

If the rocket takes off that day, the mission will last 39 days before it lands in the Pacific Ocean on November 5.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

C.Stevenson--TNT

Featured

Yesim Travel eSIMs Offer Alternative to Traditional Roaming Charges

Swiss telecommunications provider Yesim is positioning its travel eSIM services as a cost-effective alternative to conventional mobile roaming. With over four million users globally, the company offers digital plans designed to eliminate daily data caps and unpredictable charges for travelers in more than 200 destinations.

Samsung Galaxy S27 Series Camera Design Leaked via Lens Protectors

Images of camera lens protectors for the upcoming Samsung Galaxy S27 series have surfaced, offering new details about the flagship phones' rear design. The leak suggests that while the standard Galaxy S27 and S27+ will keep a vertical triple-camera layout, the Pro and Ultra models may adopt a distinct configuration with separate openings for the main and ultrawide sensors.

Driving Global Innovation - GTDC Summit APJ Underscores Distribution's Transformative Power

AI, scalability and channel empowerment lead the conversations at this year's executive event

Archive of Our Own Restores Service After Weeks-Long Security Shutdown

The Archive of Our Own (AO3) has resumed operations after a 17-day shutdown caused by an unspecified security breach. The Organization for Transformative Works announced the restoration on November 15, noting that while user data likely remains secure, certain site functionalities are temporarily limited to manage high traffic and expedite the return to full service.

Change text size: