The National Times - NASA chief rules out March launch of Moon mission over technical issues

NASA chief rules out March launch of Moon mission over technical issues


NASA chief rules out March launch of Moon mission over technical issues
NASA chief rules out March launch of Moon mission over technical issues / Photo: © AFP/File

NASA chief Jared Isaacman on Saturday ruled out a March launch for Artemis 2, the first crewed flyby mission to the Moon in more than 50 years, citing technical issues.

Change text size:

Workers detected a problem with helium flow to the massive SLS rocket that will "take the March launch window out of consideration," Issacman said in a post on X.

"I understand people are disappointed by this development. That disappointment is felt most by the team at NASA, who have been working tirelessly to prepare for this great endeavor," Isaacman said.

"During the 1960s, when NASA achieved what most thought was impossible, and what has never been repeated since, there were many setbacks."

The towering SLS rocket and Orion spacecraft will be rolled back into the Vehicle Assembly Building at the Kennedy Space Center in Florida to investigate the technical issues and make any necessary repairs, Isaacman said.

A complete briefing will follow in the coming days, he added.

The highly anticipated Artemis 2 mission, lasting about 10 days, will see three Americans and one Canadian fly around Earth's satellite.

It would be a huge step towards Americans once again setting foot on the lunar surface, a goal announced by President Donald Trump in his first term.

On Friday, NASA had set March 6 as the earliest possible launch date.

The US space agency hopes to put humans back on the Moon as China forges ahead with a rival effort that is targeting 2030 at the latest for its first crewed mission.

China's uncrewed Chang'e 7 mission is expected to be launched in 2026 for an exploration of the Moon's south pole, and testing of its crewed spacecraft Mengzhou is also set to go ahead this year.

NASA surprised many late last year when it said Artemis 2 could happen as soon as February -- an acceleration explained by the Trump administration's wish to beat China to the punch.

But the program has been plagued by delays.

The uncrewed Artemis 1 mission took place in November 2022 after multiple postponements and two failed launch attempts.

Then technical problems in early February -- which included a liquid hydrogen leak -- cut short a so-called wet dress rehearsal for the Artemis 2 launch. That was finally completed earlier this week.

The wet dress rehearsal was conducted under real conditions -- with full rocket tanks and technical checks -- at Cape Canaveral in Florida, with engineers practicing the maneuvers needed to carry out an actual launch.

NASA is hoping that the Moon could be used to help prepare future missions to Mars.

P.Jones--TNT

Featured

Mysterious world beyond Pluto may have an atmosphere: astronomers

A tiny, little-known world beyond Pluto appears to have an atmosphere, Japanese astronomers said Monday, defying what had been thought possible for icy objects in our cosmic backyard.

Datavault AI and CyberCatch Announce Signing of Binding Letter of Intent for Datavault AI to Acquire CyberCatch to Accelerate AI-Driven, Quantum-Resistant Cyber Risk Mitigation Solutions

Strategic acquisition is anticipated to position Datavault AI to bring CyberCatch's AI-enabled cyber risk mitigation solution into Datavault AI's SanQtum-secured edge Graphics Processing Unit ecosystem, addressing a global information security market projected to reach $240 billion in 2026 (Gartner)CyberCatch's post-quantum cryptography conversion plan is also expected to position the combined company ahead of the AI-enabled "Q-Day" quantum-attack horizon, now compressed to as early as 2029 (Google)AI-enabled adversary attacks in 2025 rose 89% year-over-year while average eCrime breakout time fell to 29 minutes, a 65% increase in adversary speed compared to 2024, per CrowdStrike's 2026 Global Threat Report, and Google Quantum AI research has now compressed the timeline for cryptographically relevant quantum computing to as early as 2029.

Apple earnings beat forecasts on iPhone 17 demand

Apple on Thursday said it had its best start to the year ever when it came to earnings, with iPhone demand and digital service sales helping it beat expectations.

Musk grilled on AI profits at OpenAI trial

Elon Musk sparred with lawyers for a third day Thursday at his California trial against OpenAI, struggling to explain why his own for-profit AI empire differs from the one he is trying to take down.

Change text size: